Installation Third Orangutan Bridge with HUTAN & Orang Juga

Stay up-to-date by subscribing to ConserveByU’s Telegram channel.

Subscribe Now

On 20 June 2024, the Conservation & Biodiversity Unit (CBU) in collaboration with HUTAN-Kinabatangan Orangutan Conservation Project team and Orang Juga installed the third Orangutan bridge at Sg. Pin River.

Before the installation, the team conducted a rapid site recce along the riparian area at Sg Pin to find the best and suitable tree.

Thank you HUTAN Team and Orang Juga!, we hope that the installed bridge will be beneficial towards the orangutan and other wildlife also.

Follow our Facebook page ConserveByU for our latest updates.

Fair Use Notice: The material on this site is provided for educational and informational purposes only. All intellectual property that has not been created by or the ConserveByU team has either been used with permission, credited and linked back to it’s original source, or believed to be public domain. The material on this site is distributed without profit to those who have an interest in using the included information for research and educational purposes. If you wish to use copyrighted material from this site for purposes of your own that go beyond ‘fair use’, you must obtain permission from the copyright holder. The information on this site does not constitute legal or technical advice.
Share your love